Regulatory Background
On August 28, 2025, the City of Duncanville received authorization of its Texas Pollutant Discharge Elimination System General Permit from the Texas Commission on Environmental Quality (TCEQ). The general permit requires the City of Duncanville, now a Phase III Small MS4 (municipal separate storm sewer system), to implement a Storm Water Management Plan (SWMP) within the 5-year general permit term. The City of Duncanville's SWMP includes best management practices developed for each of the following six minimum control measures:
- Public education and outreach;
- Public involvement / participation;
- Illicit discharge detection and elimination;
- Construction site storm water runoff control;
- Post-construction storm water management in new development and redevelopment; and
- Pollution prevention / good housekeeping for municipal operations.
The current Stormwater Management Program, TCEQ fact sheet, prior year annual report submittals, and TCEQ General Permit are available for review via the links below.
Duncanville Stormwater Management Program
TCEQ Fact Sheet
2025 Annual Report (Year 1)
TCEQ MS4 General Permit